Level 2 BEE
We are proudly Level 2, 51% black owned, aiming for Level 1 B-BBEEE. We meet our commitments to shareholders, customers and employees.
Scope and Summary of Services
The following is a general guideline of the scope of work covered by DP Master Electrical cc.
- Electrical Maintenance Work
- Panels and distribution systems.
- Service and electrical equipment.
- Building and general wiring.
- Routine Electrical Maintenance Work on Generators
- The general maintenance and upkeep of standby Generators from 22-2000KVA.
- Generator New Installations.
- Repair, Replace and Relocate
- Like-for-like Replacement of electrical devices and Luminaires and FLP Luminaires.
- Repair existing equipment.
- Relocations of exiting equipment from one area of the building to another using the original electrical devices i.e. moving of distribution boards, equipment, machinery and FLP machinery.
- Categories of Maintenance Work
- Wiring Devices – Light switches, Receptacles, Relays etc.
- Branch Circuits – Wire ways, cables, splicing etc.
- Installation and reconnection of standby generator for load shedding
- Lighting – Greater than 120V i.e. 208V, 240V or lighting smaller than 120V and energy efficient lighting.
- Electrical Equipment – Replacement of capacitors, contactors, equipment panels, UPS’s and invertor installations etc.
- Energy Management Systems, emergency lighting etc.
- Motors/Motor Controls – 120V Single Phase i.e. Circulation pumps, exhaust fans (small motors).
- Motors/Motor Controls – 3-Phase (Greater than 120V, less than 750V) i.e. Frequency drives, large supply pumps, assembly conveyors, mcc’s etc.
- Electrical Distribution – switch gear, panels, transformers, enclosed switches etc.
- Earthing and bonding of equipment.
- Issuing of CoC’s
(Ensuring correct SANS STD, Consulting and/or quoting to correct before issuing a CoC)
- Hazardous Areas CoC (Hospitals, Service Stations and Gas Plants).
- Service Station Forecourt and Vendor (carwash, shop and garden area) CoC.
- Factory CoC.
- Standby Generator CoC.